|

Evaluation Sheet
[data log] [final
report] [evaluation sheet]
. |
Points Possible |
Points Awarded |
Comments |
|
Log of Data
|
. |
. |
. |
|
Data Collection log
|
50 |
. |
. |
|
Report
|
|
. |
. |
|
Objective
|
5 |
. |
. |
|
Hypothesis
|
5 |
. |
. |
|
Data presentation
|
5 |
. |
. |
|
3 Pictures (tracing) before submersion, at
largest point, and after it shrinks back. |
6 |
. |
. |
|
Graph (time vs. length) |
5 |
. |
. |
|
Graph (time vs. width) |
5 |
. |
. |
|
Graph (time vs. thickness) |
5 |
. |
. |
|
Conclusion
|
14 |
. |
. |
|
Extra Credit – extra pictures drawn along the way |
3 points max |
. |
. |
|
Extra Credit – reflections |
7 points max |
. |
. |
|
TOTAL POINTS
|
100 |
. |
. |
Back to the
project description
|